View Issue Details

IDProjectCategoryView StatusLast Update
0001663T99X171.00 SKB EagleGeneralpublic2023-04-10 09:13
Reporter(ALTech) SH Son Assigned To(MFG) Yuri RuanDue Date
PrioritynormalSeveritys4-minorReproducibilityhave not tried
Status closedResolutionfixed 
Summary0001663: [EAGLE] 2023.02 Mass production inspection Report
Description[EAGLE] 2023.02 Mass production inspection Report
TagsNo tags attached.
Attach Tags

Relationships

related to 0001662 new [Eagle] Mass production inspection Report 

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , (ALTech) Sun Choul Joung , (ALTech) SY Yoon , (MFG) An Tran , (MFG) Ben Trinh , (MFG) Yuri Ruan , (PM) Dennis Lu , (PM) Sheila Tu , (PM) Tiffanie Lai , (Sales) Miya Wang

Activities

(ALTech) SH Son

2023-02-23 10:29

developer   ~0012330

Hi Yuri,

Here is inspection report of 38K delivered 2023.02.
• Critical
 : Foreign object on DC connector * 1 pcs
• Major
 : LED light leakage * 1 pcs
 : Top housing damaged * 1 pcs
• Minor
 : Bottom cover noise sound * 1 pcs

Please check this issue and let me know the analysis schedule
I will hand-carried Foreign object and damaged Top housing.

Thanks
SON

(ALTech) SH Son

2023-03-10 11:35

developer   ~0012501

Hi An
Please update the FA report for 2023.02 inspection report

Thanks
SON

(ALTech) SH Son

2023-03-15 07:32

developer   ~0012534

Hi An and Yuri,

I update the S/N information on inspection report,

Please find the attachment file

Thanks
SON

(MFG) Toney Tu

2023-03-15 18:36

developer   ~0012542

Hi Son

I would like to update "Report for BFX-AT100 - Feb 2023 Mass Production Inspection 20230315"

Thanks
Robert

(ALTech) SH Son

2023-03-16 14:46

developer   ~0012554

Hi, Robert

Here is feedback as your report. Please update the FA report
1. Foreign object on DC connector
 ALT : Please request vender FA report, I want to check vender side also.
2. LED light leakage
 ALT : Please update detailed Factory prevent action. i.g. test solution improvement - Fixture and Test program


Thanks
SON

(MFG) Toney Tu

2023-03-17 09:18

developer   ~0012564

Hi, Son

1. Foreign object on DC connector.
=> SQE was requested vender provide FA Report ( Due date: Mar 22, 2023)
2. LED light leakage
=> Vender will send new fixture in the end of march, when Fii engineer receive fixture from vender he will verify test program and update result to you ASAP.

Thanks
Robert

(ALTech) SH Son

2023-03-20 10:28

developer   ~0012574

HI Robert

1. Foreign object on DC connector.
=> SQE was requested vender provide FA Report ( Due date: Mar 22, 2023)
==> [ALT] Please upload vender FA report this mantis.


Thanks
SON

(MFG) Toney Tu

2023-03-24 09:13

developer   ~0012624

Hi, Son

Vender update the Report for foreign object in DC connector as attached file.

Thanks
Robert

(ALTech) SH Son

2023-03-24 10:59

developer   ~0012631

HI Tony

1. Explain why you analyzed the root cause of the customer's fault and did not proceed a failure analysis from the vender

as Factory FA report
Root cause : Maybe foreign object got in DC connector after Fii shipped.

and Vender FA report
Root cause : the inner ring of the male head is the probe copper ring of the testing machine.

2. In case of defective parts, please upload the factory FA process.


Thanks
SON

(MFG) Toney Tu

2023-03-24 14:33

developer   ~0012635

Hi, Son

I would like to update "Report for BFX-AT100 - Feb 2023 Mass Production Inspection 20230324 Ver2"
1. Explain why you analyzed the root cause of the customer's fault and did not proceed a failure analysis from the vender.
=> When Fii got feedback from ALT and conducted analysis process in factory and didn't find any abnormal because this device is tested normal at Mfg and don't find the same issue before. then update FA report as 20230315 Ver1.
After that, Fii sent NG picture to vender for further analysis and result is the foreign from their side.
and Fii conclusion as below and update 20230324 Ver2.
- The foreign object inside DC connector is from incoming material (vendor: Powerway).
- VI operator didn’t detect foreign object inside DC connector lead to escape this issue.
Detail as attached file

Thanks
Robert

(ALTech) SH Son

2023-04-03 09:13

developer   ~0012704

HI Tony
Please below item.
after review it, I will close this ticket.

2. LED light leakage
Action for Escape:
Improve test program to enhance test coverage. (Owner : TE/Mark Due date : Mar-30)

Thanks
SON

(MFG) Toney Tu

2023-04-04 09:14

developer   ~0012711

Hi Son

I would like to update "Report for BFX-AT100 - Feb 2023 Mass Production Inspection 20230403 Ver3"
Update action for Led light leakage issue.

Thanks
Robert

(ALTech) SH Son

2023-04-10 09:12

developer   ~0012766

HI Tony,
0001663:0012711
I checked Ver03 report, and I confirm the close the 2023.2 inspection report.

Thank you
SON

Issue History

Date Modified Username Field Change
2023-02-23 10:23 (ALTech) SH Son New Issue
2023-02-23 10:23 (ALTech) SH Son Relationship added related to 0001662
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (MFG) Ben Trinh
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (MFG) Yuri Ruan
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2023-02-23 10:23 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2023-02-23 10:23 (ALTech) SH Son Assigned To => (MFG) Yuri Ruan
2023-02-23 10:23 (ALTech) SH Son Status new => assigned
2023-02-23 10:29 (ALTech) SH Son Note Added: 0012330
2023-02-23 10:29 (ALTech) SH Son File Added: [EAGLE] 2023.02_Mass production inspection_rev01.pdf
2023-02-24 11:48 (SW) Kerwin Chen Severity s2-severe => s4-minor
2023-03-10 11:35 (ALTech) SH Son Note Added: 0012501
2023-03-15 07:32 (ALTech) SH Son Note Added: 0012534
2023-03-15 07:32 (ALTech) SH Son File Added: [EAGLE] 2023.02_Mass production inspection_rev02.pdf
2023-03-15 18:36 (MFG) Toney Tu Note Added: 0012542
2023-03-15 18:36 (MFG) Toney Tu File Added: Report for BFX-AT100 - Feb 2023 Mass Production Inspection 20230315.pptx
2023-03-16 14:46 (ALTech) SH Son Note Added: 0012554
2023-03-17 09:18 (MFG) Toney Tu Note Added: 0012564
2023-03-20 10:28 (ALTech) SH Son Note Added: 0012574
2023-03-24 09:13 (MFG) Toney Tu Note Added: 0012624
2023-03-24 09:13 (MFG) Toney Tu File Added: 20230323--SHD-5014SGLH6-ES-L2-TR(PN344 00216 005)异物分析.pptx
2023-03-24 10:59 (ALTech) SH Son Note Added: 0012631
2023-03-24 14:33 (MFG) Toney Tu Note Added: 0012635
2023-03-24 14:33 (MFG) Toney Tu File Added: Report for BFX-AT100 - Feb 2023 Mass Production Inspection 20230324 Ver 2.pptx
2023-04-03 09:13 (ALTech) SH Son Note Added: 0012704
2023-04-04 09:14 (MFG) Toney Tu Note Added: 0012711
2023-04-04 09:14 (MFG) Toney Tu File Added: Report for BFX-AT100 - Feb 2023 Mass Production Inspection 20230403 Ver 3.pptx
2023-04-10 09:12 (ALTech) SH Son Note Added: 0012766
2023-04-10 09:12 (ALTech) SH Son Issue End Monitor: (ALTech) SH Son
2023-04-10 09:13 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2023-04-10 09:13 (ALTech) SH Son Status assigned => closed
2023-04-10 09:13 (ALTech) SH Son Resolution open => fixed